PROBLEM :
Isolated temporary construction sites – the electricity is supplied either by a generator set or by an expensive temporary connection to the national grid.
A major French civil engineering company wished to be able to supply its construction site facilities with the aim of improving energy efficiency and promoting sustainable development.
PROJECT :
Produce a transportable micro hybrid electricity and cogeneration plant.
PROPOSED SOLUTION :
5 kWc photovoltaic plant, expandable to 10 kWc,
+ Generator set using 20 kVA BiOil technology
+ Tanks containing Diesel fuel and Pure Plant Oil (BiOil) for the generator.
+ Storage facility equipped with OPZV batteries: total capacity of 46 kWh
+ 24 kVA bidirectional Inverters
+ Cogeneration system with 2 X 1000-litre tanks
+ 20-ft. ISO All-in-One Container